About Us

Rennasonic is a consulting firm specializing in turbine testing for hydro-electric dams.  Our services include turbine and pump turbine performance testing, optimization and other consulting services.

Recently, we have teamed with Alden and Cameron to test the Hydraulic Performance of the third set of locks on the Panama Canal Expansion project.  For this prestigious project, Rennasonic developed a data acquisition system and acts as the role of systems integrator for subsystems that are required to test the canal.

 

Third Set of Locks Under Construction
Third Set of Locks Under Construction
DSC03393
View of Locks on Pacific side
Interior Culverts that will be used to fill and drain the locks
Interior Culverts that will be used to fill and drain the locks

Leave a Reply

Your email address will not be published. Required fields are marked *